Fletcher Bldg. Computer Room
This project man aged by Southland included installing four new 150 KVA Power Distribution Unit’s (PDU’s) with two 600 amp Power Distribution Panels, also 26 Standard equipment racks and associated circuitry. Also, installed were mechanical equipment consisting of a new 30 ton Liebert unit. The new and old mechanical equipment in the data center was oriented to accommodate the additional equipment cooling based on the newer equipment.We also had to work around existing data center to keep it up and running and to ensure a minimal amount of time for the changeover of equipment