Knott Building Walkway Renovations

Southland Contracting, Inc. installed a new sloped walkway to meet ADA requirements. Along with the sloped walkway, Southland Contracting, Inc. also fabricated and installed new railings and new carpet. This project was done in a 14 day time period over Christmas Break.

TOP