Tallahasse International Airport Waiting Area
The Tallahassee International Airport, Public Waiting Area was a complete renovation of the Samuel Adams Pub. The project provided the Tallahassee International Airport with a renovated space outside the security zone that allows their travelers to wait comfortably in style. Complete with three flat-screen TV’s, several comfortable seating spaces, and complimentary charging stations the public
- CLIENT Tallahasse Internation Airport
- YEAR 2019
- WE DID General Contracting
- CATEGORY Commercial
Altha Public School
The Altha Public School project located in Altha, FL will replace the existing school with 5 new building totaling 100,000 square feet. The project consisted of removing the previous 80,000 square foot school and replacing it with 5 buildings including a gymnasium and a dining facility. The school will house approximately 750 students when completed The project also includes a
- CLIENT Calhoun County Schools
- YEAR 2016
- WE DID General Contracting
- PARTNERS Allstate Construction
- CATEGORY Commercial
Wesley Foundation
- CLIENT Wesley Foundation at Florida State University
- YEAR 2016
- WE DID General Contracting
- CATEGORY Commercial
University Square Development
The project is a 39,000 square foot three story building constructed using concrete, steel and wood construction sitting on a 0.85 acre site. The ground level has 26 parking spaces, elevator machine room and trash room. The second level has an open breeze way and eight retail spaces. The third level has ten residential rental
- CLIENT University Square, LLC
- YEAR 2015
- WE DID General Contracting
- PARTNERS Conn & Associates
- CATEGORY Commercial
Gilchrist Elementary School
The project consisted of a brand new eight classroom wing for the third grade. The 13,000 square foot addition included eight class rooms, four planning rooms, ten restrooms and five utility rooms. The purpose of the classroom addition was to eliminate the portable classrooms that were currently being used for learning facilities on campus and
- CLIENT Leon County School Board
- YEAR Completed 2013
- WE DID General Contracting
- PARTNERS MLD Architects, Inc.
- CATEGORY Commercial
Ft. Braden School HVAC Upgrades
The Ft. Braden School HVAC Upgrade Project consists of demolition and replacement of the HVAC systems in Buildings Two, Three and Four. Southland Contracting is also replacing the HVAC Chiller systems in Building Five and the Mechanical Yard. We are rotating the existing lighting as necessary for above ceiling access. The current electrical system is
- CLIENT Leon County School Board
- YEAR 2013
- WE DID Construction Management
- PARTNERS DAG Architects
- CATEGORY Commercial
Oak Ridge Elementary Remodeling, Renovations, & HVAC Upgrades
Phase I of this project consisted of the demolition and removal of an existing boiler and chiller plant, modification of existing hot and chill water systems necessary for new equipment, installation of new boiler and chiller plant followed by start up, adjustment and testing of new equipment. Phase II of this project consisted of remodeling
- CLIENT Leon County School Board
- YEAR 2012
- WE DID Construction Management
- PARTNERS Gilchrist Ross Crowe Architects
- CATEGORY Commercial
Chipola College Center for the Arts
New 56,000 square feet building that will house Chipola College’s fine and performing arts programs, as well as space for art exhibitions. The theater will have about 650 seats with about one quarter of the seats in the balcony. The new center will also have theater participants room to build scenes inside. The center will
- CLIENT Chipola College
- YEAR 2012
- WE DID Design, Build
- PARTNERS DAG Architects
- CATEGORY Commercial
Tallahassee Community College Kitchen Renovation
Contract Work included minor demolition to provide rough in for installation of new Plumbing Fixtures, Food Service Equipment & Exhaust Hood for the Kitchen Area. HVAC modifications include a 100% Make-Up Air Unit and Exhaust Fan to work in sequence with the New Kitchen Hood. Plumbing modifications to the existing drain, waste and vent piping
- CLIENT Tallahassee Community College
- YEAR 2011
- WE DID General Contracting
- PARTNERS DAG Architects
- CATEGORY Commercial
Southland Contracting New Office Building
New two-story 8,000 square feet building that will be the new office space for Southland Contracting, Inc./Rowe Roofing, Inc.. This is a Butler Building that is also a LEED Certified Project. The schedule for this project is a fast paced schedule with important deadlines to meet.
- CLIENT Southland Contracting, Inc.
- YEAR 2008
- WE DID Design, Build
- PARTNERS DAG Architects
- CATEGORY Commercial
Maintenance Building at FAMU-FSU College of Engineering with ADA Upgrades
Exterior envelope repairs to the Maintenance Building at FAMU-FSU College of Engineering, work included the removal and replace windows, repair to the existing siding, re-roof two trailers, install new 6/0 access doors, repair plywood in multiple locations, installation of new access ramp to accommodate racing vehicles on 2 buildings and mechanical upgrades that included two
- CLIENT FAMU-FSU College of Engineering
- YEAR 2010
- WE DID Construction Management
- CATEGORY Commercial